Lead times
2L: 3–5 days · 4L: 5–7 days (working days)
Speed that survives contact with production: published working-day lead times by layer count, an engineer reviewing your files first, and no surprises added after you have paid.
2L: 3–5 days · 4L: 5–7 days (working days)
Prototypes and small batches
Engineer DFM check included
Gerber + drill files
IPC-A-600H Class 2
Prototype 3–5 days · Production 7–12 days
Prototype 5–7 days · Production 10–12 days
Prototype 7–11 days · Production 12–14 days
Prototype 9–13 days · Production 15–20 days
The clock starts when the files pass review. A question found on day one costs an email; the same question found after fabrication costs the whole lead time, twice.
FAQ
Still need help? Send us a note and we will point you in the right direction.
Email your Gerber and drill files to midst_zhong@126.com with layers, thickness, copper, finish and quantity — or start with the form and just the basics. Free engineer DFM check with every quote.